What it does: keeps each client's lines of business and schedules apart, on one install, with one roster of people. It's for outsourcers who run contact center work for several companies. An in-house contact center has one client, and never sees any of this.
Use it when: you take on work for more than one company.
You need
- The admin role, to turn it on.
- Each client's name, a short code for imports and reports (like ACME), and its time zone.
You get
- Clients, each with its own lines of business, schedule periods and published schedules.
- People who can work for several clients, one shift at a time, with each client's schedule working around the others.
Turn it on
- An admin ticks We serve several clients under Settings → Organization. Settings → Clients appears, for planners and admins.
- Your lines of business so far belong to a client named after your organization: rename it under Settings → Clients.
- Add the other clients: each with a name, a code and, if it isn't your organization's, a time zone.
- Choose each line of business's client, on the line of business. Most lists show the client with it, like Acme · Billing, or put each client's lines under its name, as Forecast does. The People list shows the line's name alone.
- Tick each client's lines of business on the shift patterns they use.
Check it before you schedule
- Every line of business is on the right client.
- Time zones. Each line of business uses its own, else its client's, else your organization's.
- Shift patterns. Each is ticked for the lines of business that use it, across clients.
- People. Everyone is on their lines of business at each client they work for.
- The order. Generate the schedules in the order you'd fill them. The first can take a shared person's whole contract, their days and hours for the week, whatever the next client needs. To share someone with another client in the same week, give them each client's line of business for its own days (one through a date, the other from the next day), or take days off them in the first client's draft, and use it, before you generate the second.
- Queues. Each line of business gets its volumes from one connection, matched to the right client's line.
How it works
Lines of business and time zones
| What | How |
|---|---|
| Codes | A line of business's code only needs to be unique within its client, so two clients can each have a BILLING. A client's own code can't be another client's. |
| A line of business's time zone | Its own if you set one, otherwise its client's, otherwise your organization's. Its forecasts and requirements use it. |
| A client's schedule | Laid out in the client's time zone. |
| Moving a line of business to another client | From a day you pick, with its people, its published shifts and its forecasts: see Moving a line to another client. |
| Forecasts | Made per line of business, so they're already per client: see Forecasting and staffing. Forecast lists each client's lines under its name. |
Moving a line to another client
Change the line's client on its page, and pick the day it works for the new client from.
- Today moves it when you save. A later day plans the move: its page shows it, says which schedule its shifts move from and to, and has a button to cancel it; its forecasts say whose it is until then. Nothing changes until midnight that day where the line works. If it can't move then, it moves as soon as it can, from that day on; the days in between stay with the old client, and planners who see every client are told.
- Before you save, Erlangly says what else changes. Its time zone stays as it was, and if it has none of its own and the new client's is different, the form says so.
- Shifts already worked stay with the client they were worked for, so adherence by client for a month you've billed doesn't change.
- From the day, its people stay on it. Its shifts on the published schedule covering the day move, as they are, to the new client's published schedule for those dates, and what the line needs goes with them, so both schedules' coverage stays right. Erlangly makes that schedule if there's none, and you can rename and redate it. Nobody's schedule changes and nobody is told. The new schedule only says to generate again with the line if it runs past the old one's last day, where the line has no shifts yet, or if the line's forecast changed since the old one was made, as the old one said.
- Shifts after that schedule, or not yet published, are removed. The old client's schedules they were on are marked to generate again without the line, and the new client's from the day with it, except a schedule its shifts moved into that ends by the old one's last day. Anyone losing a published shift is told, as for any change to their schedule.
- Drafts made before the move, of the new client's schedule its shifts moved into, say so: using one would take those shifts off again. Use one anyway, and the schedule says to generate again with the line.
- If something is in the way, such as a schedule of the new client's on those dates that isn't published yet, the form says what to do first. Planning a move, it warns you of what would stop it as things stand.
Schedules
| What | How |
|---|---|
| A new schedule period | Choose the client. The period covers that client's lines of business, and its drafts schedule the people on them. |
| Overlaps | A client's periods can't overlap, but different clients' can run side by side. |
| Shift patterns | List every client's lines of business: tick the ones each pattern is for. |
| Publishing | Each client's schedule is published on its own. See Scheduling. |
| The list of schedules | Choose a client above it to see only that client's periods. New schedule period then starts one for that client. |
People
| What | How |
|---|---|
| Lines of business | People work on lines at one client or several. Their page lists each line with its client: see People and teams. |
| One shift at a time | Generating one client's schedule works around a person's published shifts for the others, with rest either side, and takes those hours and days off their week. |
| Clashes | Changing a shift by hand so that it overlaps their shift for another client says they already work then, and a draft that would put them on both isn't used. A schedule with a clash can't be published until it's fixed: Publish lists it under One shift at a time. |
| Swaps | Stay within a client: agents can only swap with shifts in the same client's schedule. See Shift swaps. |
Imports and connections
| What | How |
|---|---|
| People | When a line of business's name or code is used at more than one client, add a client column with the client's name or code to say which. |
| Volume history | When clients share a line of business's code, use the ACD queue's ID instead, in the import or through the API. When two clients' connections have a queue with the same ID, name the connection in an acd_source column too. See Importing data. |
| Adherence for billing | The Adherence page's download names each row's client, with each person's time split by client. The API gives adherence by client, or each person's time on each client's work, for a billing or payroll script. |
| Training for billing | Training, beside the Adherence page's download, gives the training planned and done for each client and line of business, and whether the client pays for it: planners turn that off for your own, such as internal PCI training. See Training planned and done. |
| Keeping other systems in step | A script asking what's changed since gets what its token's user sees: someone limited to some clients gets changes to those clients' shifts, and to the people and time off they see, removals included. |
| ACD connections | Aren't tied to a client: match a connection's queues to any client's lines of business. Each line of business gets its volumes from one connection. See Connecting your ACD. |
One client at a time
On the wallboard, Intraday, Adherence and the list of schedules, choose a client to see only that client's lines of business, the way you choose a line of business. The client choice offers only the clients you see.
| Page | With a client chosen |
|---|---|
| The wallboard | The people working on the client's lines, with totals for them, and the client's lines as tabs. Save it as a view, like Acme TV, for the TV by that client's pod. |
| Intraday | All of the client's lines together, as it shows all lines, and its lines to choose from. |
| Adherence | The time in the client's shifts, and its lines to choose from. |
| The list of schedules | The client's schedule periods. |
With every client shown, lines of business show with their client, like Acme · Billing, so two clients' lines with the same name can be told apart. Someone limited to one client has no client to choose: they see only that client, so a TV signed in as them never shows another client's people.
Who sees what
Planners and supervisors see every client, until an admin limits them to the clients they work for: see Limit someone to some clients. Then they see only those clients' lines of business, schedules, forecasts, people and requests, on every page, in downloads and imports, and through the API and AI assistants. Someone who works for one of their clients and another too shows in both, with their other client's shifts named by client and line of business, so you know whom to ask. Admins always see every client. Agents see only their own schedule.
Seeing someone isn't the same as acting for them. Someone limited to some clients decides, adds and changes time off and exceptions only for the days a person is on one of their clients' lines of business: every day of a request that covers several. Someone who has moved to another client stays visible for 90 days, and someone coming from another client shows from the day their new line of business is added, but the days they aren't with your client are only to read: requests for those days don't wait on you or reach your bell or morning email. Whoever sees the client they're with on those days decides them. A request that runs across the move needs someone who sees both clients, such as someone on All clients.
Common issues
| You see | Why, and what to do |
|---|---|
| Changing a shift says they already work then | It overlaps their shift for another client. Move one of the two. |
| Use draft says someone would work two shifts at once | One of the draft's shifts is over their shift for another client, added or moved since the draft was made. Move or remove one of the two, then use it. |
| Publish lists One shift at a time, which blocks publishing | A shift clashes with their shift for another client. Open the One shift at a time row, choose the person's day to go to the shift, fix it, then publish. |
| An import can't tell which BILLING you mean | Two clients share the name or code. Add a client column, or use the queue's ID for volumes. |
| An import says a queue is on 2 connections | Two clients' ACDs number their queues alike. Add an acd_source column with the connection's name. |
| A planner wants to see only their client | An admin limits them under Settings → Users: see Limit someone to some clients. |
| Someone limited can't decide a request: "isn't with your client on that day" or "on all of those days" | The person moved to another client, or hasn't started with yours yet, on some or all of its days. Someone who sees the client they're with then decides it; one that runs across the move needs someone who sees both clients. |
| A limited planner can't add someone to a line of business, or give their line more days | The person also works for a client the planner doesn't see, and a new line shapes that client's schedule too: only a planner who sees all their clients does that. Ending or removing a line of the planner's own client stays theirs. |
| A limited planner can't change a site, team or pattern set | Every client shares those: a planner on All clients, or an admin, changes them. |
Terms used here
In the glossary: client, line of business and schedule period.
Next step
Schedule each client in turn: see Scheduling.